Skip to content
New: Self-serve pilots are open · Upload documents, get a design review
FedRAMP Class A · SOC 2 Type II

Turn over a record, not a binder.

Specset reads the specs, equipment schedules, approved submittals, and the O&M package into a structured asset record: locations, systems, assets, warranties, and maintenance plans, with every field cited to the page it came from.

One asset, assembled from the record. Every field traces to the page it came from.
01 · From the record

The binder becomes a database.

Assets, warranties, and procedures extracted from documents the project already produced.

02 · Cited fields

Every serial traces to a page.

Fields carry citations, and anything the extraction cannot resolve is flagged for a person, not guessed.

03 · Built to operate

Warranties and PM plans, not PDFs.

Expiration watchlists, typed maintenance checklists, and an asset registry operations can query.

Trusted by the teams delivering public work
SkanskaHNTBManson ConstructionTriton Marine ConstructionGuardian ConstructionPacific Tech ConstructionTurnagain Marine ConstructionGhirardelli Associates
Turnover used to be four gigabytes of PDFs on a shared drive. Now it's an asset registry with warranty dates we can actually query.
[Name] · [Title] · [Firm]
90K+Drawing sheets read into project records
14K+Submittals processed on Specset
01 · How the record is built

Closeout starts on day one, not at punch.

The information owners need at turnover already exists in the schedules, submittals, and manuals the job produced. Specset assembles it while the project runs, instead of in a scramble at the end.

02 · Already have the binder?

Import the package you were handed.

When the contractor delivers a thousand PDFs with their own naming scheme, one agent reads each file, matches it to its asset, and files it by role. The convention is learned from the package itself, and anything ambiguous goes to a human.

Operating the record after turnover, from work orders to warranty questions, lives on our facilities page.

Common questions

What teams ask about closeout and operations.

01What gets built from the project record?

A linked graph of locations, systems, assets, products, and companies, read from the Division 01 sections, the MEP spec divisions, the equipment schedule sheets, and approved submittals. Every extracted field carries a citation back to its source page.

02How are warranties handled?

Each distinct coverage becomes its own row: fixed windows, start-plus-duration, and duration-only terms like five years from installation, which anchor to the asset's real install or commissioning date. Component-specific terms split into separate rows, duplicates across documents are merged, and expirations surface on a 90-day watchlist.

03Can it ingest a closeout package we were handed?

Yes. The import reads the contractor's own naming convention out of each filename, matches or creates the asset, and files the document by role: installation manual, warranty, commissioning report. Combined files are split across the assets they cover, and anything unresolved is flagged for review instead of guessed.

04What maintenance data comes out?

Preventive maintenance from the IOM manuals becomes typed procedures: checklist items, pass or fail inspections, and numeric readings with units and acceptable ranges, grouped by frequency. Plans attach to every installed asset and feed a maintenance calendar with calendar, runtime, and cycle-based frequencies.

05How does this relate to closeout submittals?

The submittal log tracks the deliverables the spec requires: O&M manuals, warranties, attic stock, record documents, training. Closeout is what happens to that content after approval, turning the delivered documents into the operating record. The two run on the same project.

06What happens after turnover?

The record keeps working. Operations teams ask who to call and what the warranty says and get cited answers, work orders and meter readings run against the same assets, and spare parts carry min and max levels with reorder escalation.

Start with one building

Hand over something they can operate.

Send the project record, or the closeout binder you were handed. We'll return the asset registry with warranties and maintenance plans, cited field by field.