Skip to content
New: Self-serve pilots are open · Upload documents, get a design review
FedRAMP Class A · SOC 2 Type II
Specset Construction · For the teams that bid and build

Catch it on paper, not in concrete.

Specset screens every bid, reviews the design, checks the submittals, and keeps closeout building as you go.

Auxiliary spillway, Folsom Dam · Photo: USACE
01 · Bid

Evaluate every project before you commit.

The bid set is the cheapest place to find a problem. Specset reads the whole package the day it arrives and prices the risk with you, not after award.

Bid day · Go / no-go

Priced with eyes open.

Incoming invitations are scored against your go / no-go criteria. The contract gets a 93-point review with every unfavorable clause severity-flagged: liquidated damages, payment terms, schedule, closeout obligations. Quantities come off the sheet set as a takeoff that exports to Excel and your proposal template. And every project you price gets a screening design review, so the risk you carry into the number is the risk you chose.

Every bidscreened before you commit
93-ptcontract review, severity-flagged
Hoursfrom bid set to priced scope
Get a sample screening review
Fig. 01 · The whole package read before the number goes in
Non-standard specs welcome

Caltrans special provisions, UFGS, a railroad or port authority book, a scanned county manual: upload it as issued. Specset conforms it into one governing spec book before the screening review starts, so the estimator prices what actually governs.

How the record is built
02 · Build

The construction record runs itself.

Submittals, RFIs, revisions, safety plans, and the schedule live in one governing record that agents keep current, checked, and cited while your team builds.

Fig. 02 · The register the spec demands, reviewed against the section that governs it
Submittal register, extracted

Every required submittal pulled from the spec book and grouped into real packages, each citing its section and paragraph. A complete register in an afternoon, exported or tracked in Specset.

Submittals, pre-reviewed

Hundreds of checks per package, generated from the package's own pages and verified against the governing spec, the drawings, and the RFIs. One in three submittals gets rejected industry-wide. Yours go to the engineer of record clean, annotated, with your firm's stamp.

RFIs, checked both ways

Drafting, tracking, and response verification. Every incoming answer is checked against the latest drawings and specs before the field builds from it.

Revisions, fully compared

Every change between two drawing versions, including the changes no one clouded, with the spec impact traced. No more building from the wrong sheet.

Schedule & lookahead

Critical path, float, and baseline variance read straight from the schedule file, with a crew-level lookahead your superintendents will actually open.

Safety plans, drafted

Site-specific safety plans drafted from the contract requirements into your own templates, ready for review instead of started from blank.

1 in 3submittals rejected industry-wide on first review
2–4 wksschedule lost per rejection
100%of spec sections covered in the register
The deliverable

Findings drawn on the package.

Every issue is clouded on the page it came from, numbered, and compiled behind a clickable table of contents with your firm's stamp. The engineer of record gets a package that has already been through a review, not a first draft.

See a submittal review
Fig. 02b · Findings drawn on the package, compiled behind a clickable TOC
Works where the record lives
ProcoreAutodesk ACCSharePointEmailMCPSpecset CLI
Aerial view of a navigation lock addition under construction: tower cranes, formwork, and rebar inside a rock cofferdam
Navigation lock addition · Inland waterwayPhoto: USACE
Customer storyManson Construction

"The submittal log came off the spec book in a day. Reviews go to the engineer of record clean, and the schedule stopped eating rejections."

[Name]Project Executive · Manson Construction
Read the customer story
03 · Close out

Closeout builds as you go.

O&M packages, warranties, and asset data are captured while the work happens, not reconstructed in the last month before final.

Turnover · The record that hands off alive

The last month stops being the worst month.

Every approved submittal, warranty, and O&M document files itself into the closeout record at approval time. Contractor O&M packages are unbundled per asset instead of buried in a thousand-page PDF. Closeout documents draft into your own templates. At final, the turnover package is already assembled, and the owner inherits a record they can actually operate from.

  • Closeout record built from source documents as they are approved
  • Contractor O&M packages unbundled per asset, location, and system
  • Warranties extracted with start dates and expiration windows
  • Turnover documents drafted into your firm's own templates
See a turnover record
Work arrives as engagements?

Run it as a program.

CM firms, owner's reps, and engineers of record on task-order vehicles run Specset company-wide: engagements committed annually, unlimited users, one platform across the book of business.

See the Program plan
After delivery

The record keeps working.

At turnover, the closeout record becomes the owner's operations record: assets, warranties, maintenance plans, and work orders, answerable for the life of the asset. Projects built on Specset convert at the preferred rate.

Facilities & Maintenance
FedRAMP Class ASOC 2 Type IISpecGov CUI enclaveData never trains models
Security & compliance
Start where you are

Bring the next bid set.

Upload the specs and drawings from a project you're pricing and get a sample screening review back, typically the same day. No sales call, no procurement dance to start.