It reads requirements, not keywords.
The agent follows paragraphs across pages and distinguishes an actual submission requirement from a passing reference.
Specset builds a cited, editable submittal register from the project specifications. Review the draft, then create the records your team will manage in Specset, Procore, or Autodesk Forma Build (formerly Autodesk Build / ACC).
Separate product data from shop drawings. Group controls diagrams, points lists, and sequences into one controls package.
Specset reads the project manual and writes a cited draft. Your team reviews it before any project record is created.
Specset scans each assigned section in context, follows requirements that span pages, and confirms a submission is explicitly required before it writes a row.
Related requirements consolidate into packages a project team can review, with the section and paragraph citation kept on every row. Plain-language instructions set scan scope, packaging, numbering, and the level of detail.
Import an owner or contractor register when you have one. Specset preserves its authoritative fields, enriches its entries from the specifications, and adds the required packages the register missed.
Edit, remove, or export entries before anything becomes a project record. Approved entries can be created in Specset, or pushed to Procore or Autodesk Forma Build (formerly Autodesk Build / ACC) when that connection is configured.
Most teams use submittal register and submittal log for the same list. Specset builds that cited list from the project specifications as a reviewable draft. Project records are created only after your team approves the draft. An owner or contractor list you already have can be imported, kept, enriched from the specifications, and filled in where it missed a required package.
The agent follows paragraphs across pages and distinguishes an actual submission requirement from a passing reference.
Related requirements consolidate while product data, shop drawings, samples, and closeout packages stay distinct.
Edit, remove, export, or select entries in the draft before approved rows become project records.
“The log that used to take a week of reading came back the same afternoon, with the governing paragraph behind every row.”
Specset scans every assigned section in context, verifies that a submission is explicitly required, then turns the requirements into packages a real project team can review.
Product Data: Rated capacities, performance, sound power, and accessories for each type.
Shop Drawings: Air-terminal schedule, room locations, sizes, and accessories.
Closeout submittals include operation and maintenance data.
The agent keeps the surrounding section in view.
One practical package can draw from several paragraphs.
Section and paragraph citations stay with the register.
Use plain-language instructions to control scan scope, packaging, numbering, and the level of detail. The agent applies them while it reads, not after the spreadsheet is finished.
Keep product data and shop drawings separate. Group controls diagrams, points lists, and sequences together. Create separate closeout packages. Follow our section-based numbering.
Natural-language project conventionImport an owner or contractor register first. Specset preserves its authoritative fields, enriches its entries from the specifications, and adds required packages the register missed.
Numbers, titles, dates, status, and revisions remain authoritative.
Add descriptions and citations. Identify required packages not logged.
Every row shows where it came from before anything is created.
Select the entries you want, create the project submittals, and let the configured Procore or Autodesk Forma Build connection keep the working records synchronized.
Editable records, source citations, dates, types, and status.
Specset reads the project manual, confirms a submission is explicitly required, and groups practical packages with a section and paragraph citation on every row. Review the draft before anything becomes a project record.
Most teams use submittal register and submittal log for the same list. Specset builds that cited list from the project specifications as a reviewable draft. Project records are created only after your team approves the draft. An owner or contractor list you already have can be imported, kept, enriched from the specifications, and filled in where it missed a required package.
No. The agent reads each assigned section in context, follows requirements that span pages, and confirms a submission is explicitly required before it writes a row. Every entry keeps the section and paragraph citation that justifies it.
Yes. Import an owner or contractor register first and Specset preserves its authoritative fields, enriches its entries from the specifications, and adds the required packages the register missed. You see what came from where before anything is created.
Yes. Packaging, numbering, scan scope, and level of detail are set with plain-language instructions, and the agent applies them while it reads. Controls diagrams, points lists, and sequences can land in one package if that is how your reviewers want to receive them.
Wherever your team manages submittals. Approve the draft and create records in Specset, or push them to Procore or Autodesk Forma Build and let the connection keep the working records synchronized.
MasterFormat project manuals, plus non-standard formats like Caltrans, WSDOT, FDOT, UFGS, and BNSF, including special provisions amended into standard sections. The log is built from the conformed record, so amendments are already applied.
Fully. Every entry can be edited, removed, or exported before creation, and nothing becomes a project record until your team approves it. The draft is the starting point, not the decision.
Merge the base spec, every addendum, and the special provisions into one conformed text per section. Search it, scan it, and cite it to the paragraph.
Extract every opportunity from bid boards and notices, then read the full invitation. Damages, bonding, set-asides, and schedule risks come back cited before the go / no-go.
Work the agreement, conditions, and special provisions through a systematic checklist. A severity-flagged review table puts the contractor-unfavorable clauses on the table, cited.
Give Specset a recent project manual and your packaging conventions. We'll show you the cited, editable register it produces.