Skip to content
New: Self-serve pilots are open · Upload documents, get a design review
FedRAMP Class A · SOC 2 Type II

Build the submittal register the specifications actually require.

Specset reads the project manual, interprets each requirement, and groups practical packages with citations. Review the draft, then create the records your team will manage in Specset, Procore, or Autodesk Build.

A reviewable register first. Project records only after your team approves it.
01 · Reasoning-based

It reads requirements, not keywords.

The agent follows paragraphs across pages and distinguishes an actual submission requirement from a passing reference.

02 · Package-aware

Built the way reviewers receive the work.

Related requirements consolidate while product data, shop drawings, samples, and closeout packages stay distinct.

03 · Reviewer-controlled

A draft before project records.

Edit, remove, export, or select entries before the approved log becomes the working register.

Trusted by the teams delivering public work
SkanskaHNTBManson ConstructionTriton Marine ConstructionGuardian ConstructionPacific Tech ConstructionTurnagain Marine ConstructionGhirardelli Associates
The log that used to take a week of reading came back the same afternoon, with the governing paragraph behind every row.
[Name] · [Title] · [Firm]
31K+Spec sections conformed, Caltrans and UFGS included
14K+Submittals managed and reviewed on Specset
01 · Specification reasoning

It reads the section before it writes the log.

Specset scans every assigned section in context, verifies that a submission is explicitly required, then turns the requirements into packages a real project team can review.

01
Requirements can span pages.

The agent keeps the surrounding section in view.

02
Grouping requires construction judgment.

One practical package can draw from several paragraphs.

03
Every row retains its basis.

Section and paragraph citations stay with the register.

02 · Your conventions

Tell the agent how your team wants the register built.

Use plain-language instructions to control scan scope, packaging, numbering, and the level of detail. The agent applies them while it reads, not after the spreadsheet is finished.

01Scan selected sections or divisions
02Split or consolidate package types
03Follow the project numbering convention
The project convention becomes an instruction, not a spreadsheet cleanup exercise.
03 · Existing register

Start with what exists. Find what is missing.

Import an owner or contractor register first. Specset preserves its authoritative fields, enriches its entries from the specifications, and adds required packages the register missed.

Register authority stays intact. Specification gaps become visible.
04 · Register handoff

Approve the draft. Put the register into the workflow.

Select the entries you want, create the project submittals, and let the configured Procore or Autodesk Build connection keep the working records synchronized.

Editable before creationExportable to ExcelBidirectional project sync
Common questions

What teams ask about the submittal log.

01Is this just a search for the word "submittal"?

No. The agent reads each assigned section in context, follows requirements that span pages, and confirms a submission is explicitly required before it writes a row. Every entry keeps the section and paragraph citation that justifies it.

02Can it start from the register we already have?

Yes. Import an owner or contractor register first and Specset preserves its authoritative fields, enriches its entries from the specifications, and adds the required packages the register missed. You see what came from where before anything is created.

03Can we control how packages are grouped and numbered?

Yes. Packaging, numbering, scan scope, and level of detail are set with plain-language instructions, and the agent applies them while it reads. Controls diagrams, points lists, and sequences can land in one package if that is how your reviewers want to receive them.

04Where do the records end up?

Wherever your team manages submittals. Approve the draft and create records in Specset, or push them to Procore or Autodesk Build and let the connection keep the working records synchronized.

05What specification formats does it handle?

MasterFormat project manuals, plus non-standard formats like Caltrans, WSDOT, FDOT, UFGS, and BNSF, including special provisions amended into standard sections. The log is built from the conformed record, so amendments are already applied.

06How editable is the draft?

Fully. Every entry can be edited, removed, or exported before creation, and nothing becomes a project record until your team approves it. The draft is the starting point, not the decision.

Start with a project manual

Build the register before procurement starts.

Give Specset a recent project manual and your packaging conventions. We'll show you the cited, editable register it produces.